# Speaker attribution review worksheet Original synthetic example and blank evaluation template. No audio or product result is included. ## Fictional reference timeline | Start (s) | End (s) | Reference speaker | Words | Identity confidence | Note | |---|---|---|---|---|---| | 0 | 4 | Mara | I will check the drawing. | Known in this fictional reference | Ownership requires correct attribution | | 4 | 7 | Ken | Do not release the lot. | Known | Preserve negation | | 6 | 8 | Mara | Wait for the inspection. | Known | Overlaps Ken from 6–7 seconds | | 8 | 10 | Unknown | Friday? | Unknown | Do not invent owner or commitment | ## Test conditions - Meeting/audio ID and consent record location: - Model/service/version and configuration: - Individual/shared microphones; noise; languages; overlap coverage: - Reference reviewers and uncertain-reference handling: - DER boundary tolerance and overlap policy, if DER is calculated: - Named attribution matching rules and exclusions: ## Annotate each consequential segment | Start/end | Reference words | Reference identity/confidence | Output words | Output cluster | Displayed identity | Word error | Cluster error | Name error | Verified commitment/owner/deadline | Evidence location | Review status | |---|---|---|---|---|---|---|---|---|---|---|---| | | | | | | | | | | | | | Use [inaudible] for words without a defensible reference; retain overlap and reviewer uncertainty. Keep unknown identity unknown. Separate correct words from correct attribution and from supported summary content. ## Report - WER with reference word count: - DER with reference speaker time and scoring settings: - Correctly named statements / statements with known reference identity: - Unknown-identity statements / all reviewed statements: - Unsupported or incorrectly assigned commitments: - Reviewer time and unresolved disagreements: ## Fictional DER arithmetic Separate no-overlap example: (10 seconds missed + 5 seconds false alarm + 5 seconds speaker confusion) / 100 seconds reference speech = 20%. This does not describe the timeline above or any service. ## Approval before handoff - Owner confirmed: - Commitment confirmed: - Deadline/time zone confirmed or explicitly absent: - Reviewer and approval date: ## Completed correction record for the fictional excerpt | Field | Incorrect draft | Reviewed record | Source | |---|---|---|---| | Drawing-check owner | Ken | Mara | 0–4 seconds: Mara accepts the check | | Drawing-check deadline | Friday | Not established; confirm | 8–10 seconds: unidentified question | | Lot release | Ken will release it | Release remains prohibited | 4–7 seconds: preserve “not” | | Inspection dependency | Omitted | Wait for inspection; owner not established | 6–8 seconds: overlapping statement | Resulting action: Mara — check the drawing; deadline to confirm. Retained constraints: do not release the lot; wait for inspection. Actual deployment: preserve original draft and source, record reviewer and date, obtain participant confirmation, and update the team's authoritative task record. No specific application relabel control is assumed.