# Physical AI pilot evidence card Blank planning asset. No measurements have been supplied. Complete before testing; use the same definitions at review. - Decision owner / date: - Task and business decision: - Site, robot, software version, gripper, configuration: - Approved inputs / excluded inputs: - People, interfaces, connectivity and exception boundaries: - Qualified application review and applicable approved procedures: | Requirement | Definition and denominator | Predetermined threshold | Observed result and source | Vendor-reported claim and date | Unknown / next evidence | |---|---|---|---|---|---| | Eligibility coverage | Eligible arrivals / all arrivals | | | | | | All-arrival autonomous output | Unassisted accepted / all arrivals | | | | | | Autonomous completion | Accepted unassisted / eligible | | | | | | Assisted completion | Accepted with help / eligible | | | | | | Assistance burden | Human minutes / scheduled hour | | | | | | Recovery | Detection to defined resumed state; distribution | | | | | | Quality | Accepted output / inspected output; defects defined | | | | | | Throughput | Accepted output / scheduled hour | | | | | Do not sum assisted and autonomous output when reporting autonomous completion. Preserve failed attempts, excluded work and downtime. - Training and language support owner: - Exception response / escalation / permitted restart owner: - Decision: expand / revise / stop / insufficient evidence - Reason against precommitted thresholds: - Approved change, owner, follow-up date: - Remaining unknowns and limits of the sample: ## Fictional shift calculation — replace every input before use - One scheduled hour: 200 arrivals; 171 autonomous accepted; 6 assisted accepted; 3 failed; 20 out of range. - Autonomous accepted: 171 / 180 eligible = 95%; 171 / 200 all arrivals = 85.5%. - Requirement: 88% of 200/hour = 176 autonomous accepted/hour. - Immediate support: 6 × 2 minutes + 3 × 3 minutes + 20 × 0.5 minute = 31 staff-minutes/hour. - Available support after other duties: 20 staff-minutes/hour. - Eight-hour projection: autonomous accepted 1,368 versus 1,408 required; support 248 versus 160 staff-minutes available. - Total accepted including assistance: 177/hour; do not count it as autonomous output. - The twenty out-of-range housings require additional manual processing not priced in the routing time. The three failed placements remain unaccepted. - Decision: revise. More support alone does not close the autonomous-output gap. - Projection assumes the same hourly mix, cycle performance and support times; validate over scheduled time and record clustered exceptions before expanding. ## Shift-capacity inputs - Scheduled hours and all-arrival rate: - Autonomous accepted units per scheduled hour, including stops: - Intervention count × staff-minutes per intervention, by outcome: - Downstream manual processing and its capacity: - Available staff-minutes after other duties: - Concurrent exception events and recovery-time distribution: